Electrical + Sensor Integration
Master Card Building — Multi-Level Parking Sensors
Yerwada, Pune · 2025

Complete electrical scope covering conduit routing, cabling, and termination for a multi-level car parking installation at the Master Card building, Yerwada, Pune. GI conducting was executed to specification, with cable routing coordinated to the site's structural and safety plan.
Per-slot presence sensors were deployed across parking levels. Sensor data is fed to a controller which then updates the parking management system in real time — enabling live occupancy status, guided routing signage, and audit trails.
The system reduces search time inside the building, improves throughput at peak hours, and integrates cleanly with the existing facility management workflow.

